The old fireplace firebox is demolished leaving the chimney for the new fireplace. The dismantled timber frame pieces are restored offsite. Plumbing is run for a below grade bathroom. A steel beam is prepared for installation. Kevin goes clamming.
Channel: WGTE CREATE
Length: 00:24:51 / Episode: 4419
Previous Episodes | |||
| Ch. | Day | Date | Time |
|---|---|---|---|
| 30.1 | Sat | 04/22/2023 | 2:00 pm |
| 30.1 | Sat | 04/29/2023 | 1:30 pm |
| 30.3 | Mon | 05/01/2023 | 8:00 am |
| 30.3 | Mon | 05/01/2023 | 2:00 pm |
| 30.3 | Fri | 05/05/2023 | 8:00 am |
| 30.3 | Fri | 05/05/2023 | 2:00 pm |
| 30.3 | Sat | 05/06/2023 | 8:30 am |
| 30.3 | Sat | 05/06/2023 | 3:00 pm |
| 30.3 | Thu | 02/05/2026 | 8:00 am |
| 30.3 | Thu | 02/05/2026 | 2:00 pm |
| 30.3 | Fri | 02/06/2026 | 4:00 am |